California ADU Plans & House Plans
What are infill house plans?
Infill house plans are home designs sized and laid out to fit on already-developed land — a backyard, a side yard, a split lot, or a narrow vacant parcel between existing homes. In California, they are usually used to build ADUs, junior ADUs, SB 9 duplexes, and small-lot starter homes.
Unlike standard stock plans, infill plans are designed around tight setbacks, shared utilities, privacy from neighbors, and the size limits in state housing law. That makes them faster to permit and easier to fit on a real lot.
Common infill plan types:
- Detached ADUs: backyard homes, typically 400–950 sq ft
- Attached ADUs and JADUs: additions or conversions within or beside the main house
- SB 9 duplex plans: two units on one single-family lot, or side-by-side pairs for lot splits
- Small-lot and townhome plans: compact two- and three-story homes for starter-home subdivisions
- Narrow-lot homes: full-size houses for lots as narrow as [25] feet
Which California laws allow infill homes on my lot?
Four sets of state laws open most California residential lots to more homes: ADU law, SB 9, the Starter Home Revitalization Act, and recent permit-streamlining laws. Most qualifying projects get ministerial approval, meaning the city checks them against objective standards instead of holding discretionary hearings.
| Law | What it allows | Plans that fit |
|---|---|---|
| State ADU law | An ADU and a junior ADU on most residential lots, approved ministerially | Detached and attached ADUs, JADUs |
| SB 9 (2021) | Two homes on a single-family lot, plus an urban lot split — up to four homes in many cases | Duplex and side-by-side plans |
| Starter Home Revitalization Act (SB 684, SB 1123, SB 1116) | Small-lot subdivisions of up to 10 homes on qualifying multifamily and vacant single-family lots, with a 60-day ministerial review | Small-lot homes, townhomes |
| Streamlining laws (AB 130, SB 9 of 2025) | Firmer permit deadlines for ministerial projects; state ADU rules apply where local ordinances fall out of compliance | All of the above |
Eligibility depends on your zoning, lot size, location (fire zones, coastal zone, historic districts), and local objective standards. Our lot check tells you which path fits before you buy a plan.
Sources: HCD Starter Home Revitalization Act fact sheet · Allen Matkins on small-site reforms · Mondaq on SB 1116 · Maxable on 2026 ADU laws
Our California plan collections
Every collection is drawn for California lots and California code. Pick by what your lot allows and what you want to build.
| Collection | Size range | Best for | Starting at |
|---|---|---|---|
| Backyard ADUs | 400–950 sq ft | Rental income, family housing, aging in place | $895 |
| Garage conversions and JADUs | 150–500 sq ft | Lowest-cost added unit | under $500 |
| SB 9 duplexes |
1,600 square feet of combined unit area |
Two homes on one lot, or one home per split lot | $1,595 |
| Small-lot and townhome plans | 900–1,800 sq ft | Builders doing 3–10 home starter-home projects | $1,295 |
| Narrow-lot homes | 1,200–2,400 sq ft | Vacant infill parcels | $1,295 |
Each plan set includes: architectural drawings, floor plans, elevations, sections, a Title 24 energy compliance pathway, and [structural sheets / structural-ready framing]. [Modification and site-plan services available.]
How do I go from a lot to a permit?
Most California infill projects follow five steps, and a pre-designed plan removes most of the design time from the front of the process.
- Check your lot. Confirm zoning, lot size, setbacks, utilities, and any fire, coastal, or historic overlays. Our free lot check does this for you.
- Choose a plan. Pick a plan that fits your lot and your goal — rental, family, sale, or a multi-home project.
- Adapt it to your site. Add your site plan, utility connections, and any local objective standards your city requires.
- Submit for permit. Ministerial projects get a fixed review timeline under state law. We help answer plan-check comments on our drawings.
- Build. Hand the permitted set to your contractor or prefab partner.
Why plans built for California matter
Plans drawn for other states often fail California plan check because of energy, seismic, and fire rules that are stricter here. Our plans start from California requirements, not national averages.
- Title 24 energy code: layouts and envelopes designed to meet California's energy standards, including solar-ready roofs where required.
- California Building and Residential Codes: current-cycle CBC/CRC compliance
- Seismic design: framing and lateral systems suited to California's seismic zones
- Wildfire (WUI) options: ember-resistant vents, ignition-resistant materials, and Chapter 7A-ready details for high fire hazard zones
- Infill-friendly layouts: windows and entries placed for privacy on tight lots, and footprints that respect common 4-foot side and rear setbacks
- Objective-standards ready: clean elevations and options that adapt to local design rules without discretionary review
Frequently asked questions
Can I build an ADU on my lot in California?
Most single-family and multifamily lots in California can add at least one ADU under state law. Cities must review a complete ADU application within 60 days and cannot deny it for reasons outside objective standards.
How big can an ADU be in California?
State law generally allows detached ADUs up to 1,200 sq ft, and cities must allow at least 800 sq ft. Local rules can vary within those limits, so check your city's ordinance.
Do I have to live on the property to build an ADU?
No. California no longer allows cities to require owner-occupancy for ADUs. SB 9 lot splits are different: the owner usually signs an affidavit to live in one unit for three years.
What is an SB 9 plan?
An SB 9 plan is a home design sized for California's SB 9 law, which allows two homes on a single-family lot and an urban lot split. Together, these can allow up to four homes where one stood before.
What is the Starter Home Revitalization Act?
It is a California law, expanded by SB 684, SB 1123, and SB 1116, that allows small subdivisions of up to 10 homes on qualifying lots with a 60-day ministerial review. It is designed for small, for-sale starter homes.
Are your plans pre-approved by my city?
Many California cities now offer pre-approved ADU plan programs. [Our plans are pre-approved in [cities] / We can help you submit our plan to your city's program.] Otherwise, our plans go through standard ministerial plan check.
How much do California infill plans cost?
Our plans start at [price] for ADUs and [price] for duplex and small-lot designs. That is typically a fraction of custom architecture, which often runs [price range] for a comparable project.
How long does it take to get a permit?
With a ready plan, most ADU and SB 9 projects can be submitted in [weeks] instead of months. City review timelines for ministerial projects are set by state law, though plan-check corrections can add time.
Do your plans work in wildfire zones and the coastal zone?
Yes, with options. We offer WUI-ready details for high fire hazard areas. Coastal zone lots may need a coastal development permit, which we can help you plan for.